Poltergeist Refresh (Update 2)

Poltergeist’s station has been repainted green and resembles the updated main structure paint job.

Ghostly figures have been added to the queue and station area of Poltergeist

Painting of Poltergeist’s main ride structure is now complete.

A second look at the ghostly figure that now stands atop Poltergeist’s station.

Previous
Previous

Poltergeist Refresh (Update 3), Sundance Theatre Demolition

Next
Next

Poltergeist Refresh (Update 1)