The Joker Carnival of Chaos (Update 3), Hustler (Update 1), Texas Tumble (Update 1), Dining & Shopping Updates

All of Hustler’s ride cars have been removed and are undergoing extensive refurbishment.

Crews are also working on improvement’s to the ride’s floor.

Another look at Hustler’s floor undergoing refurbishment.

All Jelly Belly logos have been removed from the outside of the future Boardwalk Treasures shop on Fiesta Bay Boardwalk.

New flooring has been installed at the future Boardwalk Treasures shop.

Construction walls have been put up around the future Coaster Candy location. Crews have been repainting the inside of the shop as well.

New platforms are being constructed inside Teatro Fiesta for a potential new show coming soon.

A new gel coat has been added to the trough of the Texas Tumble water slide attraction in White Water Bay.

Siding and other wood pieces are currently being replaced at the future home of Chop Six.

Crews have begun moving dirt at the future home of The Joker Carnival of Chaos.

Another angle of the work happening at The Joker Carnival of Chaos site.

Crews were working at the site during our visit.

A brand new sign has been added to the Bee Bop’s food stand in Rockville.

Previous
Previous

The Joker Carnival of Chaos (Update 4), Hustler (Update 2), DC Universe & General Park Updates

Next
Next

The Joker Wild Card & Whirligig (Update 2), Shopping Changes