Construction Updates
Multi-Ride DC Universe Expansion (Update 8), Ride Refurbishments
Six Flags Fiesta Texas is in the home stretch of their DC Universe expansion. The third attraction, Shazam! Tower of Eternity, has gone vertical as work also continues on Metropolis Transit Authority and Cyborg: Cyber Revolution. The surrounding area has also seen a number of dining and retail refreshes. Other park projects include a Hustler refurbishment and a paint refresh of Goliath's track.
Multi-Ride DC Universe Expansion (Update 7), Ride Refurbishments
The DC Universe expansion area has reopened as Batgirl Coaster Chase and Green Lantern Emerald Flight continue their theming refreshes. Most of the track for Metropolis Transit Authority is now installed, not including the station area and transfer track. Ground work moves forward for the Shazam! Tower of Eternity ride. Other projects include fresh paint for Goliath and a refurbishment of the Hustler ride.
Multi-Ride DC Universe Expansion (Update 6), Other Park Projects
Construction continues to move along on Fiesta Texas’ new multi-ride DC Universe expansion. The first attraction, Cyborg: Cyber Revolution, has been installed and is currently in testing. The area as a whole, however, still requires a great deal of work to be completed. Other updates include the new Daily Planet gift shop near Superman Krypton Coaster and other theming enhancement projects.
Multi-Ride DC Universe Expansion (Update 5), Hurricane Harbor Expansion (Update 2)
This update features multiple behind-the-scenes looks at construction around Fiesta Texas. The first shipment of new DC Universe ride components has arrived while crews continue to transform the primary construction area with new themed elements and footers. Water slides in Hurricane Harbor are also installed and receiving their final touches before a grand opening.
DC Universe Expansion (Update 4), Fountain Refurbishments
The refresh of existing DC Universe attractions has moved along substantially since our last update as these rides all now feature new paint schemes. DC Universe’s three new attractions have not arrived on-site, but foundation work is well under way for Shazam! Tower of Eternity and Cyborg: Cyber Revolution.
DC Universe Expansion (Update 3)
Work is picking up on preexisting attractions within the new DC Universe expansion at Fiesta Texas. The transformations into Supergirl Sky Flight, The Penguin: Gotham City Getaway and Batgirl Coaster Chase are in the early stages of their transformation as crews prepare them for a fresh coat of paint.
Six-Slide Hurricane Harbor Expansion (Update 1), DC Universe Expansion (Update 2)
Work is under way as Hurricane Harbor San Antonio, Fiesta Texas’ water park, begins the addition of six new children’s slides. Join us for a behind-the-scenes construction tour of the progress. Clearing also continues at the site of the new DC Universe expansion, which will be home to three new attractions in 2024.
Three-Ride DC Universe Expansion (Update 1)
Now that Kid Flash Cosmic Coaster has made its grand debut, the next phase of DC Universe transformations begin. Construction walls have gone up inside Thrill Seeker Park and demolition of both the children’s play ship attraction and the performance stage is under way. Sky Searcher and Rambling Road are also closed while the demolition progresses.
Kid Flash Cosmic Coaster (Update 7)
Kid Flash Cosmic Coaster’s ride area is shaping up as crews work on the finishing touches of the Aurora LED lighting panels and station structure. Surrounding work still taking place includes the queue line area, shade structures and an entrance portal.
Kid Flash Cosmic Coaster (Update 6)
Kid Flash Cosmic Coaster test runs are officially under way. Set to open in October, crews are actively working on constructing the coaster’s station, along with preparing the surrounding area for the ride’s entrance and queue line.
Kid Flash Cosmic Coaster (Update 5), Bucking Broncos Relocation
Since our last visit, installation of supports and track for Kid Flash Cosmic Coaster has been completed. Both trains have also been added to the track. Crews now work on installing the ride’s Aurora LED lighting system. Early work has also begun on the relocation of Bucking Broncos to Crackaxle Canyon.
Kid Flash Cosmic Coaster (Update 4), New Hurricane Harbor Slides, Circuit Breaker Go-Carts, New Fatburger Restaurant
Several track pieces and ride components have arrived on-site for Kid Flash Cosmic Coaster. Within the park, work is under way as crews prep to pour foundation for the new coaster. New children’s water slides set for Hurricane Harbor are also now on-site. Other park happenings include electric vehicle charging, new shade at security, the introduction of Fatburger and more.